• Skip to primary navigation
  • Skip to content
Deletros

Deletros

Arquitetura, Engenharia e Meio Ambiente

  • Home
  • About us
  • History
  • Architecture
  • Engineering
  • Environment
  • Cases
  • The Future
  • Contact
en_GB
en_GB pt_BR

SPTrans

São Paulo Transporte S. A.

Cases / SPTrans

Executive Project of Generator implantation and improvements of the electrical system of 6 Bus Terminals of SPTRANS

Executive Project for implementation of emergency generator and adaptation of the existing electrical installations in the following Bus Terminals in São Paulo city:

  • JOÃO DIAS
  • CAPELINHA
  • JARDIM ÂNGELA
  • TIRADENTES CITY
  • D. PEDRO II PARK
  • PENHA

Photos and Videos

Basic Design of the Collective Transportation Corridor Ragueb Chohfi - Aricanduva

Cadastral survey involving topography, geotechnics and interferences. Functional study for the circulation of vehicles and pedestrians with the location of the stopping points and geometric design. Design of horizontal, vertical and traffic light signaling. Public lighting, drainage, paving and architecture of stopping points.

Engineering and environmental licensing

Specialized engineering and environmental licensing services for:

  • Capelinha Terminal (Bus Terminal)
  • Bus corridor Ragueb Chohfi

Photos and Videos

© 2026 Deletros