• Skip to primary navigation
  • Skip to content
Deletros

Deletros

Arquitetura, Engenharia e Meio Ambiente

  • Home
  • About us
  • History
  • Architecture
  • Engineering
  • Environment
  • Cases
  • The Future
  • Contact
en_GB
en_GB pt_BR

CEMIG

Energy Company of Minas Gerais

Cases / CEMIG

Projects for the Expansion of Poço Fundo´s Hydroelectric Power Plant

Civil, electrical and mechanical design with adaptation of equipment including forced piping, project for installation of the turbo generator group with 5 MW and new substation.

Location: Rio Grande – MG

Projects of Jaguara’s Hydroelectric Power Plant with 696 MW of installed capacity

Design of the dam, spillway, concrete structures, water intake, adductor system and forced conduit, electromechanical installations, power house, river diversion, road system, electrical system, specification of hydromechanical, electrical, civil works and memorials equipment, monitoring and enforcement.

Location: Jaguara Hydroelectric Plant - Rio Grande – MG

© 2026 Deletros