• Skip to primary navigation
  • Skip to content
Deletros

Deletros

Arquitetura, Engenharia e Meio Ambiente

  • Home
  • About us
  • History
  • Architecture
  • Engineering
  • Environment
  • Cases
  • The Future
  • Contact
en_GB
en_GB pt_BR

CELPA

Eletric Central of Para State

Cases / CELPA

Basic and executive design, inspection, testing and reception of Curua Uma’s Hydroelectric Power Plant

Basic and executive design, inspection, testing and reception of the Curuá Una Hydroelectric Power Plant with 4 units of Kaplan turbines and vertical generator with 10 Mw of installed power. The dam was implanted in sandy soil having been studied and designed with the best geotechnical techniques.

Location: Para

© 2026 Deletros